This chart lists the projects in the area of building services engineering we have successfully handled over the past years. Our scope of delivery includes the development of control and visualisation software plus supply of PLC components and control cabinets (with the exception of University Hospital Frankfurt). We were also responsible for the entire commissioning process and the performance record as official termination of the project. Our customers place particular value on the combination of our profound knowledge and long-term experience in the area of supply plant engineering with high-quality ICA technology, enabling us to minimise interface complications and offer valuable project support.
Customer | Year | Description | Data- points | Equipment | Characteristics |
---|---|---|---|---|---|
Lufthansa AG Computing Centre Kelsterbach |
2009 | Centralised management of 73 recirculating cooling devices for the cooling of server rooms at the Lufthansa computing centre | approx. 800 | Saia Industrial PLC, EXOR panel, STEP7/Designer6 | Total air volume 255.000 m³/h |
Lufthansa AG Computing Centre Kelsterbach |
2009 | Upgrading of the cooling system of the computing centres 1 and 3 through integration of two screw compressors plus pumps/flaps into the two existing central cooling units | approx. 220 | Saia Industrial PLC, existing BAS STEP7 | Total cooling capacity ca. 2 MW |
University Hospital Frankfurt | 2010 | Upgrading of energy supply system part 1: refrigeration plant consisting of three cooling devices (0,7; 3,5; 2,1 MW) seven cooling towers, water treatment and distribution network | approx. 1600 | Simatic S7/300; Multipanel MP270 STEP7/WinCC | Total cooling capacity ca. 6,3 MW |
University Hospital Frankfurt | 2011 | Upgrading of energy supply system part 2: heating / hot water, consisting of four steam heat exchangers, condensed water treatment, distribution | approx. 350 | Simatic S7/300; Multipanel MP270 STEP7/WinCC | Total heating capacity ca. 30 MW |
University Hospital Frankfurt | 2011 | Upgrading of energy supply system part 3: steam supply consisting of feed-in/distribution 17 and 2,5 bar steam turbine 1,1 MVA; clean steam generation; auxiliary systems | approx. 320 | Simatic S7/300; Multipanel MP270 STEP7/WinCC | Total cooling capacity ca. 30 MW |
Novartis AG Location Stein |
2013 | GMP-Upgrade of the TKI laboratory; Laboratory ventilation system (7 rooms) with regulation of pressure cascade with constantly changing exhaust air volumes | approx. 140 | Saia Industrial PLC, web visualisation, STEP7/WebEditor | Airflow rate Ca. 10.000 m³/h |
Novartis AG Location Stein |
2013 | Extension of a tabletting cabin with volume and pressure regulation during operation. Validated project plan | approx. 25 | Siemens S7/200, existing BAS, STEP7 | Airflow rate ca. 2.500 m³/h |
Novartis AG Location Stein |
2013 | Construction of a heat cabin with circulating air heating. Validated project plan | approx. 25 | Siemens S7/200, existing BAS, STEP7 | Airflow rate ca. 1.500 m³/h |
Novartis AG Location Stein |
2014 | GMP-compliant construction of a fully climatised label storage with outdoor, exhaust and circulating air system | approx. 150 | Saia Industrial PLC, WEB visualisation, STEP7/WebEditor | Airflow rate ca. 10.000 m³/h |
West Pharmaceutical Services, Eschweiler | 2016 | Plant optimisation of pressure and temperature control circuits | approx. 64 | Siemens ET 200SP | TIA-Portal programming |
West Pharmaceutical Services, Eschweiler | 2016 | Uprgading of control system and control cabinet | approx. 112 | Siemens ET 200SP | TIA-Portal programming |