Projects and custom software

(References in the area of ICA engineering for technical building services)

This chart lists the projects in the area of building services engineering we have successfully handled over the past years. Our scope of delivery includes the development of control and visualisation software plus supply of PLC components and control cabinets (with the exception of University Hospital Frankfurt). We were also responsible for the entire commissioning process and the performance record as official termination of the project. Our customers place particular value on the combination of our profound knowledge and long-term experience in the area of supply plant engineering with high-quality ICA technology, enabling us to minimise interface complications and offer valuable project support.

CustomerYearDescriptionData- pointsEquipmentCharacteristics
Lufthansa AG
Computing Centre Kelsterbach
2009 Centralised management of 73 recirculating cooling devices for the cooling of server rooms at the Lufthansa computing centre approx. 800 Saia Industrial PLC, EXOR panel, STEP7/Designer6 Total air volume 255.000 m³/h
Lufthansa AG 
Computing Centre Kelsterbach
2009 Upgrading of the cooling system of the computing centres 1 and 3 through integration of two screw compressors plus pumps/flaps into the two existing central cooling units approx. 220 Saia Industrial PLC, existing BAS STEP7 Total cooling capacity ca. 2 MW
University Hospital Frankfurt 2010 Upgrading of energy supply system part 1: refrigeration plant consisting of three cooling devices (0,7; 3,5; 2,1 MW) seven cooling towers, water treatment and distribution network approx. 1600 Simatic S7/300; Multipanel MP270 STEP7/WinCC Total cooling capacity ca. 6,3 MW
University Hospital Frankfurt 2011 Upgrading of energy supply system part 2: heating / hot water, consisting of four steam heat exchangers, condensed water treatment, distribution approx. 350 Simatic S7/300; Multipanel MP270 STEP7/WinCC Total heating capacity ca. 30 MW
University Hospital Frankfurt 2011 Upgrading of energy supply system part 3: steam supply consisting of feed-in/distribution 17 and 2,5 bar steam turbine 1,1 MVA; clean steam generation; auxiliary systems approx. 320 Simatic S7/300; Multipanel MP270 STEP7/WinCC Total cooling capacity ca. 30 MW
Novartis AG
Location Stein
2013 GMP-Upgrade of the TKI laboratory; Laboratory ventilation system (7 rooms) with regulation of pressure cascade with constantly changing exhaust air volumes approx. 140 Saia Industrial PLC, web visualisation, STEP7/WebEditor Airflow rate Ca. 10.000 m³/h
Novartis AG
Location Stein
2013 Extension of a tabletting cabin with volume and pressure regulation during operation. Validated project plan approx. 25 Siemens S7/200, existing BAS, STEP7 Airflow rate ca. 2.500 m³/h
Novartis AG
Location Stein
2013 Construction of a heat cabin with circulating air heating. Validated project plan approx. 25 Siemens S7/200, existing BAS, STEP7 Airflow rate ca. 1.500 m³/h
Novartis AG
Location Stein
2014 GMP-compliant construction of a fully climatised label storage with outdoor, exhaust and circulating air system approx. 150 Saia Industrial PLC, WEB visualisation, STEP7/WebEditor Airflow rate ca. 10.000 m³/h
West Pharmaceutical Services, Eschweiler 2016 Plant optimisation of pressure and temperature control circuits approx. 64 Siemens ET 200SP TIA-Portal programming
West Pharmaceutical Services, Eschweiler 2016 Uprgading of control system and control cabinet approx. 112 Siemens ET 200SP TIA-Portal programming